Reference

CAFM and maintenance glossary.

Plain-English definitions of the terms used in facilities, estates and maintenance management, with UK usage where it differs.

A · B · C · E · F · G · H · I · J · L · M · O · P · R · S · T · U · V · W

A

Application for payment (AFP)

A contractor’s request to be paid for a batch of completed, chargeable jobs, usually once per billing cycle. The client’s finance team audits it against the jobs and budgets before it is approved and invoiced. How applications for payment work in GeoWorks.

Asset

An individual item you maintain: a boiler, a fire alarm panel, a ticket gate, a lighting column. In a CAFM system, the asset is where jobs, requests, documents and history attach.

Asset hierarchy

The structure that places each asset in context, for example estate, site, location, installation and asset. A good hierarchy lets engineers find the right asset quickly and lets you report at any level. See asset management software.

Asset register

The record of every asset you are responsible for, with its location, attributes, condition, documents and maintenance history.

Asset type

A kind of asset, such as an emergency light fitting or a gas boiler, with its own set of attributes and maintenance regime. Types are usually grouped into families such as fire, electrical, mechanical and lighting.

Assumed Residual Life (ARL)

A value that ILP GN22 lets owners develop for each lighting column, as an estimate of its remaining life to support replacement planning and budgeting. See our street lighting inspection and testing guide.

B

BS 7671

The IET Wiring Regulations: the UK standard for electrical installations. Part 6 covers inspection and testing; Section 714 covers outdoor lighting installations, including street lighting.

C

CAFM

Computer-aided facilities management. Software for running the buildings and assets an organisation is responsible for: helpdesk, reactive and planned maintenance, contractors, compliance and costs. See what is CAFM software?

Charge code

In street lighting, a code published by Elexon identifying a type of unmetered equipment, such as a lamp and its control gear. With the switch regime, it is used to calculate energy consumption. See unmetered supply.

CMMS

Computerised maintenance management system. Software focused on maintaining assets: work orders, preventive maintenance schedules and asset history, often with spares and inventory. See CAFM vs CMMS.

Compliance (planned maintenance compliance)

The share of planned maintenance visits completed within their window, usually reported by category, with statutory categories shown separately. See the statutory compliance guide.

Compliance after first visit

The share of planned visits completed correctly on the first attendance, without a remedial or a return visit. A measure of contractor quality alongside headline compliance.

Contractor (supplier)

An external company that carries out maintenance work. In GeoWorks and many CAFM systems the term is supplier; an FM provider’s own subcontractors are suppliers too. See contractor management software.

Criticality

How important an asset or task is to safety, compliance or the operation. SFG20 rates tasks red (statutory), pink (business critical), amber (optimal) or green (discretionary). Fault reports can also carry a criticality that drives their priority.

E

EAM

Enterprise asset management. Software covering the whole life of physical assets, from acquisition through maintenance and performance to disposal and capital planning. Common among infrastructure owners and asset-intensive organisations.

EICR

Electrical Installation Condition Report. The report produced by a periodic inspection and test of a fixed electrical installation under BS 7671, recording its condition and any observations.

F

First-time fix

The share of jobs completed on the first visit, without a return. A key measure of contractor and operative performance. See maintenance reporting.

G

GN22 (ATOMS)

Institution of Lighting Professionals Guidance Note 22, Asset-Management Toolkit: Minor Structures. A risk-based approach to the inspection, testing and management of lighting columns and similar minor structures, using visual inspection and non-destructive testing. See our guide to GN22 and BS 7671.

H

Helpdesk

The team and system that receive fault reports and requests, triage them and turn them into jobs. Sometimes called the service desk or operations centre. See helpdesk and fault reporting.

I

Installation

In an asset hierarchy, a system or item of plant that groups assets within a site, such as fire detection, HVAC, a lighting circuit or a lift.

IWMS

Integrated workplace management system. A suite covering real estate, leases, space, projects and facilities together, typically bought by corporate real estate teams.

J

Job

The everyday UK term for a work order: a specific piece of work to be done, with a site, asset, priority, supplier and cost. One request can lead to several jobs.

L

Location

A zone or area within a site, such as a floor, room, platform or plant room. Recording the location makes faults easier to find and assets easier to manage.

M

Make safe

Immediate action to remove a hazard, such as isolating a supply or cordoning off an area, before a permanent repair. Often tracked as its own target within an emergency SLA.

MTTR

Mean time to repair. The average time taken to restore an asset after it fails. More common in CMMS and engineering settings; facilities teams often measure SLA response and completion times instead.

O

ONTE

Order Not To Exceed. A spending limit, typically set per job type, up to which a contractor can go ahead without further approval. Work above the limit needs a quote or a decision first.

Operative

The engineer or technician who attends site and does the work, employed by a contractor or in-house. See the field service mobile app.

P

PPM

Planned preventive (or preventative) maintenance. Maintenance carried out at set intervals to keep assets safe, compliant and working. See planned maintenance software and our guide to SFG20 and PPM.

Preferred supplier

The contractor set to cover a particular site and service, so new reactive and planned jobs route to them automatically.

Priority

How urgent a job is, such as emergency, urgent or routine. Each priority usually carries response and completion targets.

Purchase order (PO)

A document authorising spend with a supplier. Some organisations raise one per job; others work to spending limits or a schedule of rates and pay in batches.

R

RAMS (risk assessment and method statement)

The risk assessment identifies hazards and control measures for a task; the method statement sets out how the work will be done safely. Operatives typically review and sign them before starting work.

Reactive maintenance

Work done in response to a fault or failure, rather than on a schedule. It usually carries an SLA based on its priority.

Remedial

A job to fix a defect found during a planned inspection or test. Remedials should stay linked to the visit that found the defect.

Request

A fault report or service request received by the helpdesk, before it becomes a job. In some organisations it is called an incident.

S

Schedule of rates

A list of pre-agreed prices for defined tasks or items, used to value work under a maintenance contract without quoting each job separately.

SFG20

A library of building maintenance schedules and tasks, developed by BESA and published by SFG20 Ltd, which describes itself as the industry standard for building maintenance. Each task carries a frequency and a criticality colour. See our SFG20 guide.

Site

A top-level property in an estate: a station, a pub, a store, an office or a depot, with its own address, contacts, suppliers and documents.

SLA

Service level agreement. The agreed targets a supplier works to, usually response and completion times by priority. See our work order management guide.

Statutory maintenance

Inspection, testing and servicing the law requires, such as fire alarm servicing, gas safety checks, electrical inspection, legionella control and asbestos management. See the statutory compliance guide.

T

Triage

Reviewing an incoming request to decide whether it is valid, who is responsible, how urgent it is and what job to raise, or to reject it with a reason. Routine faults can be triaged automatically with workflow automation.

U

Unmetered supply (UMS)

An electricity supply billed without a meter, common for street lighting and street furniture. Consumption is calculated from an inventory of connected equipment, using each item’s charge code and switch regime, so an accurate inventory means an accurate bill.

V

Visit

An operative’s attendance on site for a job. A job may need several visits, for example to make safe, survey and then complete the repair.

W

Work order

An instruction to carry out a specific piece of maintenance work: what, where, which asset, by whom, by when and within what budget. Usually called a job in UK facilities. See work order management.

Workflow automation

Rules that act on requests and jobs without a person, such as raising jobs for routine faults or releasing planned maintenance on schedule, while sending anything uncertain to the helpdesk. See workflow automation.

Book a demo

See GeoWorks on your estate.

Tell us about your sites, assets and contractors. We’ll show you GeoWorks configured the way you work, and the pipeline we’d build with you during onboarding.

30 mintailored demo
2002on critical estates since
iOS + Androidoffline mobile app

Prefer email? sales@geoworks.io

We reply within one working day. No obligation.