Guide · 7 minute read

Statutory maintenance compliance for multi-site estates.

The main UK statutory maintenance regimes, what they usually involve, and how to evidence compliance across hundreds of sites without a week of spreadsheet work before every audit.

Please note

This guide is general information, not legal advice. Requirements differ between England, Wales, Scotland and Northern Ireland and by type of premises. Always confirm intervals with your competent persons, insurers and enforcing authorities.

What counts as statutory maintenance?

Statutory maintenance is the inspection, testing and servicing the law requires to keep people safe. If you are responsible for premises (as an owner, landlord, tenant or employer), some of these duties sit with you even when a contractor does the work.

Across a multi-site estate, the challenge is rarely knowing what the law says. It is proving, site by site and asset by asset, that the work actually happened on time, and that anything found was put right.

The main regimes

AreaKey legislation and guidanceTypical activities
Fire safetyRegulatory Reform (Fire Safety) Order 2005 (England and Wales); Fire (Scotland) Act 2005; BS 5839-1; BS 5266-1Fire risk assessment; weekly alarm tests and periodic servicing; emergency lighting monthly checks and annual full-duration tests; extinguisher servicing; fire door checks
ElectricalElectricity at Work Regulations 1989; BS 7671Periodic inspection of the fixed installation (EICR); inspection and testing of portable equipment where risk requires it
GasGas Safety (Installation and Use) Regulations 1998Servicing and safety checks by Gas Safe registered engineers; annual gas safety records for let accommodation
Water hygieneHSE ACoP L8; HSG274Legionella risk assessment; temperature monitoring; flushing little-used outlets; tank and calorifier inspections
AsbestosControl of Asbestos Regulations 2012Asbestos register and management plan; periodic re-inspection of known materials; surveys before refurbishment
Lifts and lifting equipmentLOLER 1998; PUWER 1998Thorough examination, typically every six months for equipment that lifts people and every twelve months otherwise
Pressure systemsPressure Systems Safety Regulations 2000Written scheme of examination and periodic examination by a competent person

How to prove compliance across many sites

Auditors, insurers and clients ask the same questions: what should have happened, did it happen on time, what was found and what was done about it. A system that answers those for every site needs five things.

1. Schedules against the right object

Attach each regime to the site, location, installation or individual asset it covers. A fire alarm servicing schedule belongs to the fire alarm system; emergency lighting tests may belong to each fitting.

2. Automatic release and assignment

Visits that depend on someone remembering to raise a job will eventually be missed. Schedules should release on their own, on your calendar, to the preferred contractor.

3. A clear measure

Measure compliance as planned visits completed within their window, by category. Track compliance after first visit and open remedials alongside it, so a contractor can’t look compliant by attending and leaving the defects.

4. Evidence on the job

Certificates, test results, photos and sign-off should be attached to the job and the asset at the time of the visit, not chased afterwards.

5. Remedials linked back

When an inspection finds a defect, the remedial job should stay linked to the original visit, so you can show the whole story from finding to fix.

In GeoWorks

Planned maintenance compliance is reported by category with a one-click statutory filter, compliance after first visit, open and awaiting remedials, and an export for audit. See how it works.

Common pitfalls

  • Counting jobs, not assets. One “fire servicing” job for a site can hide the fact that half the extinguishers weren’t checked.
  • Certificates in inboxes. If evidence lives in email, it isn’t evidence until someone finds it.
  • Remedials that drift. A defect noted on an inspection report is a known risk until it’s fixed.
  • One calendar for every regime. Different regimes need different periods; some estates (rail, for example) plan in their own periods.
Book a demo

See GeoWorks on your estate.

Tell us about your sites, assets and contractors. We’ll show you GeoWorks configured the way you work, and the pipeline we’d build with you during onboarding.

30 mintailored demo
2002on critical estates since
iOS + Androidoffline mobile app

Prefer email? sales@geoworks.io

We reply within one working day. No obligation.