This guide is general information, not engineering or legal advice. Refer to the current ILP and IET publications and BS 7671 themselves, and set inspection and testing intervals with competent structural and electrical advice.
Why street lighting is different
A street lighting network is an estate of a very particular kind. Instead of a few hundred buildings, there are tens or hundreds of thousands of small assets spread along every road: columns, lanterns, brackets, control gear, illuminated signs and bollards. Each one is both a structure that can fall and an electrical installation in a public place.
That gives a lighting authority, or the contractor maintaining the network for it, three jobs that have to agree with each other:
- Structural inspection and testing of columns and other minor structures, guided by ILP GN22.
- Electrical inspection and testing of the installation, to BS 7671.
- An accurate inventory, which both of the above depend on, and which also drives the energy bill.
Structural inspection: ILP GN22 (ATOMS)
GN22 is a guidance note published by the Institution of Lighting Professionals (ILP). Its full title is GN22 Asset-Management Toolkit: Minor Structures, usually shortened to ATOMS. The current edition was published in 2019 and replaced the earlier TR22.
What it covers
GN22 applies to anyone responsible for minor structures: lighting columns, traffic posts and signal poles, signs, CCTV and WiFi columns, floral decorations and similar. It is not only for highway authorities; the ILP lists rail, waterways, docks and harbours, commercial and retail premises and utilities among the sectors it applies to. It makes clear that columns supporting luminaires, signals and CCTV are minor structures and should be assessed and managed as such.
A risk-based approach
Rather than one fixed regime for every column, GN22 sets out a risk-based approach using visual inspection and non-destructive testing. It helps owners decide what inspection and testing to carry out, and considers how interventions can extend a structure’s life and how additional attachments can shorten it.
Assumed Residual Life
GN22 lets owners develop an Assumed Residual Life (ARL) value for each lighting column. Informed by inspection and testing, ARL turns a one-off pass or fail into a forward view, which supports long-term planning and budgeting for column replacement.
That only works if results are recorded against the individual column, consistently, test after test. A spreadsheet of this year’s results can’t tell you how a column has changed since the last one.
Electrical testing: BS 7671
BS 7671, the IET Wiring Regulations, sets the requirements for electrical installations in the UK. Two parts matter most for street lighting:
- Section 714, outdoor lighting installations, covers lighting for roads, car parks, parks and other public places, along with street furniture such as illuminated road signs, telephone kiosks, bus shelters and advertising panels. It supplements or modifies the general requirements of BS 7671 for these installations.
- Part 6, inspection and testing, covers both initial verification of new work and periodic inspection and testing of existing installations. NICEIC guidance says supplies to street furniture should be regularly inspected and tested in line with the general requirements of Part 6.
Section 714 also recognises how highway networks are actually maintained: where a programmed inspection and testing procedure is in place, the periodic inspection and RCD test notices otherwise required on the installation may be omitted. In other words, the programme itself, and its records, take the place of a label on every column.
Behind BS 7671 sits the general duty in the Electricity at Work Regulations 1989 to maintain electrical systems so as to prevent danger. The IET also publishes a Guide to Highway Electrical Street Furniture on the electrical safety requirements for lighting, signs, EV charge points and other on-street equipment.
Typical test types
Operatives typically need to record different kinds of electrical work against an asset: periodic inspection and testing of an existing installation, testing of a new installation, and minor works such as replacing a lantern or control gear. Each produces its own certificate or report, so the app and the asset record should handle each type rather than one generic “electrical test”.
Bringing structural and electrical work together
Structural and electrical programmes are often managed separately, but they attend the same assets. Planning them together, where it makes sense, saves visits and traffic management. More importantly, keeping both sets of results on the same asset record means you can see a column’s whole condition, not two half-pictures in two systems.
Defects found by either programme should become remedial jobs linked to the inspection that found them, and a column that fails structurally should be made safe and tracked through to replacement.
Authority and contractor: who holds what
Most lighting networks are owned by a highway authority and maintained by a contractor, or by an in-house team working like one. Responsibility for the network stays with the owner, but the evidence is created by whoever does the work. That split causes most of the record-keeping problems.
- The owner sets the policy: what is inspected and tested, how often, to what standard, and what happens to a failed column.
- The contractor plans the programme, does the work and produces the results and certificates.
- Both need the same inventory and the same history. If results arrive as monthly spreadsheets or PDFs, the owner’s records are always out of date, and the contractor’s next visit starts without the last result.
When the contract changes hands, the inventory and its full test history must go with the network, not with the outgoing contractor. It is worth writing that into the contract.
The asset records that hold it all up
Inspection and testing are only as good as the inventory they run against. For each unit, a useful record holds:
- Location and identity: a unique reference, the road, and a position precise enough to find it at night.
- Elements: the column, bracket, lantern, lamp or LED module, control gear and any photocell or control node, each with its own attributes.
- Structural attributes: column type, material, height and installation date, plus any attachments.
- Test history: every structural and electrical test, with results, dates, the operative and the certificate.
- Energy data: charge codes for the lamp and control gear.
Why charge codes matter
Most street lighting is an unmetered supply. Rather than reading a meter, energy is calculated from the inventory: each item of equipment carries an Elexon charge code, which together with its switch regime (the hours it operates) lets annual consumption be calculated. If the inventory is wrong, so is the bill. Every lantern replacement or LED conversion recorded in the field should update the charge codes on the asset.
Night scouting and public reports
Alongside planned inspection, most networks find faults two ways: night scouts patrolling for lamps out, and reports from the public. Both should land in the same queue as the inspection programme, against the same asset record, so a lantern reported out three times in a month is obvious, and a column with a structural defect isn’t visited for a lamp change without anyone noticing.
A practical checklist
- Every column, lantern, sign and bollard is in one inventory, with a unique reference and its elements.
- Structural and electrical results are recorded against the individual asset, not in separate spreadsheets.
- Your inspection and testing intervals are written into your asset management policy, with the reasoning.
- Defects become remedial jobs linked to the inspection that found them.
- Field work updates the inventory, including charge codes, as it happens.
- Public reports and night scout findings go into the same queue as planned work.
- Authority and contractor see the same data, so evidence isn’t passed back and forth.
How GeoWorks supports street lighting
GeoWorks manages lighting assets from inventory to inspection, testing and fault repair for street lighting contractors including E.ON and M Group. The lighting asset register covers columns, lanterns, controls, signs and bollards, with their elements and attributes. On the GeoWorks Mobile app, operatives record GN22 ATOMS structural tests, with sensible defaults, the option to start from the last test, and signatures, and BS 7671 electrical tests against the asset, online or offline.
Lamp and control charge codes are held on each asset’s elements and calculated, so the inventory is ready for unmetered supply reporting. An accessible public fault form sends reports into the same triaged queue, and highway authorities and their contractors work in the same system. See GeoWorks for street lighting and highways.