What is planned preventive maintenance?
Planned preventive maintenance (PPM) is maintenance carried out at set intervals to keep assets safe, compliant and working, instead of waiting for them to fail. Servicing a boiler before winter, testing emergency lighting, inspecting fire doors and checking water temperatures are all PPM.
Some of it is required by law (statutory maintenance). Some is required by a contract, an insurer or a manufacturer’s warranty. The rest is done because it is cheaper than the breakdown it prevents. A good PPM regime knows which is which, because that decides what you can safely change and what you can’t.
What goes into a PPM schedule?
A PPM schedule is the plan of which tasks happen to which assets, and when. Each line in it should answer:
- What: the asset or system it applies to, such as a fire alarm system, a boiler, an emergency light fitting or a lift.
- Which task: the specific work, such as inspect, test, clean, replace or certify.
- How often: the frequency, and the window within which it counts as on time.
- Why: statutory, contractual, best practice or discretionary.
- Who: the contractor or in-house team, and any competence required (Gas Safe registration for gas work, for example).
- Evidence: what proves it was done: a certificate, test results, photos or a signed checklist.
Writing all of that from scratch for every asset type is a large job, and doing it inconsistently across an estate is a compliance risk. That is the problem SFG20 sets out to solve.
What is SFG20?
SFG20 describes itself as “the industry standard for building maintenance”. It is a library of maintenance schedules for building assets: for each type of asset, the tasks to carry out, how often, and how critical each task is. It is developed by BESA (the Building Engineering Services Association) and published by SFG20 Ltd, and SFG20 says the standard has been in place since 1990.
SFG20 is a subscription product. According to SFG20, the standard is only available through its Facilities-iQ platform, which covers more than 1,500 colour-coded tasks and schedules across more than 110 asset classes, kept aligned with UK regulations through regular updates. Facilities-iQ also integrates with CAFM, CMMS and IWMS systems.
Facilities teams use it to build a maintenance specification for their estate. Contractors use it to price and deliver that specification. It gives both sides a shared, published reference for what “properly maintained” means.
SFG20 criticality: red, pink, amber and green
Every SFG20 task carries a criticality rating, shown as a colour. The definitions below are SFG20’s own, from its guidance on task criticality.
| Colour | Meaning | What it implies |
|---|---|---|
| Red | Statutory or legal | A legal requirement. Not optional. |
| Pink | Business critical, contractual or operational | Specific to a sector or organisation, for its own compliance. Not required by law, but may be required by your contract or sector rules. |
| Amber | Optimal | Function critical or industry best practice. The task that keeps the asset working well. |
| Green | Discretionary | Non-critical. Worth doing where budget and risk allow. |
SFG20 says its definition of a statutory task was agreed jointly with BSRIA, CIBSE and IWFM, and that its own technical authors set the ratings. Subscribers on some Facilities-iQ plans can change the criticality of non-statutory tasks for their own sites; statutory tasks stay red.
Statutory vs optimal: where you have choices
The colours are most useful when budgets are tight. They separate the work you can’t defer from the work you can plan around.
- Red tasks are fixed. Do them on time, by a competent person, and keep the evidence. Our statutory compliance guide covers the main UK regimes.
- Pink tasks are fixed for you. Check your contracts, leases, insurance conditions and sector rules. If a client contract names a task, it carries the same weight as a legal one for that contract.
- Amber and green tasks are where risk-based decisions belong. Frequencies can reasonably change with an asset’s condition, its criticality to the site, manufacturer instructions and failure history. A chiller serving a server room and one serving a storeroom don’t need the same regime.
Whatever you decide, record why. “We moved this task from quarterly to six-monthly because of condition and failure history” is a defensible decision. A task that quietly stopped happening is not.
SFG20 is not legislation, and using it does not by itself make you compliant. The duty is to carry out and evidence the work. Confirm statutory requirements and intervals with your competent persons, insurers and enforcing authorities.
Building a PPM schedule step by step
1. Start with the asset register
You can’t schedule maintenance on assets you haven’t recorded. Build a register structured the way your estate actually works: site, location (floors, rooms, plant rooms, platforms), installation (systems such as fire detection or HVAC) and individual assets. See asset management software.
2. Map asset types to task lists
Group assets into types, then give each type its task list and frequencies, whether from SFG20, manufacturers’ instructions or your own engineers. Do it once per type, not once per asset.
3. Attach schedules to the right object
Some regimes belong to a whole system (fire alarm servicing), others to each fitting (emergency lighting tests), others to a site (a legionella risk assessment review). Attaching each schedule to the right level is what lets you report compliance by asset rather than by job.
4. Assign the contractor
Set the preferred supplier for each site and service, so planned jobs route to them automatically with the right SLA.
5. Release on your calendar
Jobs should release ahead of their due window without anyone raising them. If your organisation plans in its own periods, such as four-week rail periods, schedules should follow those rather than calendar months.
6. Capture evidence and remedials on the visit
Certificates, readings and photos belong on the job and the asset at the time of the visit. Defects found should become remedial jobs linked back to the visit that found them.
7. Forecast and review
Look ahead at upcoming visits by period for budgeting and resourcing, and review amber and green frequencies at least once a year against what the data shows.
Frequencies, windows and calendars
A frequency on its own isn’t enough to measure against. Each task also needs a window: the period within which a visit counts as on time. A monthly emergency lighting test might be compliant anywhere within its month; an annual service might have a few weeks either side of its due date. Agree windows with your contractors up front, because they decide what counts as late.
Decide too whether a missed visit moves the next one. If an annual service slips by two months, does next year’s fall due twelve months after the planned date or after the actual visit? Either can be right, but it should be a rule, not an accident.
Finally, use the calendar your organisation actually plans in. Retailers may plan around trading peaks, and rail operators often plan in four-week periods rather than calendar months.
Measuring PPM compliance
The headline measure is simple: the share of planned visits completed within their window, by category, with statutory categories shown separately. Two more measures stop that headline being misleading:
- Compliance after first visit: visits done properly on the first attendance, without a return.
- Open remedials: defects found on planned visits that haven’t yet been fixed. A visit that found a defect and left it is a known risk, not a tick.
Common pitfalls
- Copying a whole library without reviewing it. Adopting every amber and green task for every asset can produce a specification nobody can afford, and get quietly ignored.
- Counting jobs instead of assets. One completed “emergency lighting” job can hide fittings that weren’t tested.
- Schedules that depend on a person. If someone has to remember to raise each PPM job, some will be missed.
- Evidence in inboxes. A certificate nobody can find on audit day isn’t evidence.
- Frequencies changed without a record. Changes to non-statutory tasks should be deliberate and documented.
Running PPM in GeoWorks
Whatever the source of your task lists, whether SFG20, manufacturers’ instructions or your own engineers, GeoWorks is where the schedules run. Asset types carry their own maintenance regime. Schedules attach to a site, location, installation or individual asset, each with its own service, frequency and preferred supplier. Jobs release on a standard calendar or a custom period such as rail periods, and go straight to the preferred supplier with their SLA.