What is a work order?
A work order is an instruction to carry out a specific piece of maintenance work: what needs doing, where, to which asset, by whom, by when and within what budget. It is also the record of what actually happened, from the first visit to sign-off.
UK facilities teams use several words for the same thing:
- Job is the everyday term in most UK estates and FM contracts, and the one GeoWorks uses.
- Work order is the more common term in CMMS products and US-origin software.
- Purchase order (PO) is the commercial side: the authority to spend with a contractor. Some organisations raise a PO per job, others work to a schedule of rates or a spending limit and invoice in batches.
A work order is not the same as a request. A request is someone telling you something is wrong. A work order is your decision to do something about it. Keeping the two separate matters: one request can produce no job (a duplicate), one job, or several (a make-safe now and a full repair later).
What is work order management?
Work order management is the process of getting each job from creation to close, on time, to the right standard and at the right cost, with a record you can rely on afterwards. On one site with an in-house team, a whiteboard and a spreadsheet can just about do it. Across tens or hundreds of sites with several contractors, it can’t: jobs get lost between inboxes, nobody knows which are late until someone complains, and finance pays invoices it can’t match to work.
The work order lifecycle
Most estates follow some version of these stages. Names vary, and the stages should be configurable, but the questions at each step are the same.
1. Request
A fault is reported by phone, email, a web form or a sensor alert, or a planned task falls due. Capture the site, the location within it, the asset if known, a description and photos. Give the reporter a reference number straight away so they don’t have to chase.
2. Triage
Someone, or a rule, decides what the request is. Is it valid? Is it a duplicate of an open job? Whose responsibility is it? How urgent is it? Rejections should carry a reason. Routine faults are good candidates for automated triage, leaving people to decide the ones that need judgement.
3. Raise the job
The job is created with a priority, service (electrical, plumbing, fire and so on), supplier, cost centre and any spending limit. Linking it to the asset, not just the site, is what makes asset history and repeat-fault reporting possible later.
4. Assign
The job goes to an in-house team or a contractor. In a multi-site estate this should be automatic: each site and service has a preferred supplier, so a heating fault at site 214 goes straight to the heating contractor for that region. The supplier accepts the job, and the SLA clock is already running.
5. Schedule and attend
The supplier allocates an operative and a visit. On arrival, the operative completes a risk assessment, records the condition, does the work and captures evidence: photos, test results, materials and time on site. If they can’t finish (no access, parts on order, a quote needed), that should be recorded with the reason, not left as a silent open job.
6. Complete
The operative marks the work complete and the customer or site contact signs off. Any further work found becomes a linked follow-on or remedial job rather than a note on a report.
7. Verify
Someone checks the job meets the standard: was the evidence attached, does the description match the fault, is the cost within the limit? For statutory work, the certificate should be on the job and the asset.
8. Invoice or apply for payment
The supplier bills for the work. Some estates invoice per job against a PO. Others have suppliers submit an application for payment (AFP) each billing cycle covering a batch of completed, chargeable jobs, which finance audits against the jobs and budgets before it is approved. Either way, cost should be visible on the job from the moment it is raised, not discovered at month end.
9. Close
The job closes with its full history attached to the asset: what was reported, what was done, by whom, when and at what cost.
The job pipeline runs triage, raise, schedule, work, payment and close, and is configurable: rename stages, add approval gates, set priorities and SLAs and choose who is notified. See how a fault becomes a job.
Priorities and SLAs
Priorities decide what gets done first. SLAs (service level agreements) turn priorities into measurable promises. A workable set has a small number of levels, each with a response target (attend or make safe) and a completion target (fixed). Here is an example structure. The targets are illustrative; yours should come from your contracts and risk assessment.
| Priority | Typical use | Example response | Example completion |
|---|---|---|---|
| P1 Emergency | Immediate risk to people or the building, or the site can’t operate | Within hours | Make safe, then a follow-on job |
| P2 Urgent | Significant impact on service or trading | Same or next working day | Within days |
| P3 Routine | Defects that can wait for a planned visit | Within a week or two | Within weeks |
| P4 Planned | Minor works and improvements | By arrangement | By agreed date |
Three things make SLAs work in practice:
- Plain definitions. Write down which faults belong in each priority with examples, so two helpdesk staff make the same call.
- Clocks that start on their own. The SLA should run from the moment the job is raised, and show breaches coming while there’s still time to act.
- Make-safe as its own step. An emergency can be safe within hours and fixed days later. Track both, or P1 completion figures become meaningless.
Reactive, planned and remedial work
Most work orders fall into one of three types, and it helps to keep them distinct in reporting.
- Reactive jobs respond to a fault. They are unpredictable and usually carry an SLA.
- Planned jobs come from a planned preventive maintenance (PPM) schedule: servicing, inspections and statutory tests at a set frequency. They should release automatically. See our guide to SFG20 and planned preventive maintenance.
- Remedial jobs fix defects found on a planned visit. They should stay linked to the inspection that found them, so you can show the whole story from finding to fix.
The ratio of planned to reactive work is a useful health check. An estate where most work is reactive is usually paying for it in emergency call-outs and repeat faults.
What changes across many sites
- Routing. The right contractor depends on the site and the service. Set it once per site and service, not per job.
- Spending control. A spending limit per job type lets contractors get on with small jobs, while anything bigger needs a quote. In UK FM this is often called an ONTE (Order Not To Exceed) limit.
- Duplicates and repeats. Three people report the same broken door. The same boiler fails every winter. Seeing the site’s full history at triage catches both.
- Contractors in the system. If suppliers can accept jobs, plan visits and record work themselves, status stops being a phone call.
- Reporting by site, region and supplier. Averages across the estate hide the sites and suppliers that need attention.
What to measure
- SLA performance: response and completion targets met, by priority, supplier and site.
- First-time fix: jobs completed on the first visit.
- Open and overdue work: the backlog, and how old it is.
- Repeat faults: the same fault at the same asset within a set period.
- Cost: by site, supplier, service and priority, and reactive against planned.
What to look for in work order management software
- One queue for every channel. Phone, email, web form and sensor alerts, all tagged with site, location and asset.
- A configurable pipeline. Your stages, approvals, priorities and SLAs, not a fixed vendor workflow.
- Automatic assignment to the preferred supplier per site and service.
- A mobile app that works offline, with risk assessments, photos and sign-off, because plant rooms and basements rarely have signal.
- Evidence on the job and the asset, not in someone’s inbox.
- Cost on the job from the start, with spending limits, quotes and payment checked against completed work.
- Live reporting that filters by site, region, supplier and service, and exports for audits and client reports.
- An API, so jobs can flow to finance, BI and client systems.
Where GeoWorks fits
GeoWorks runs reactive and planned jobs through one configurable pipeline. Faults arrive by phone, email or a branded web form into one triaged queue; jobs go to the preferred supplier for the site and service with their priority and SLA; operatives work on the offline mobile app; and suppliers apply for payment, which finance audits against ONTE budgets. SLA and first-time fix reporting reads the same live data. See GeoWorks CAFM software.